
Add to Cart
Slag steel silo,Its material is Q345 or Q235,for the pulverized coal boiler:
Introduction: steel silo, ash silo usually consists of the following parts: 1, capsule, 2, steel support, 3, escalator assembly, 4, silo top platform, 5, steel support platform, 6, electrical control room, 7, gasification groove 8, lifting device, etc.
1, The ash silo cylinder choose carbon structural steel Q235 - A manufacturing. Silo wall plate using CNC flame cutting machine cutting blanking, high dimensional accuracy, convenient for field welding construction. Top for cylindrical shell, bottom slag body is conical. Capsule bottom with unloading equipment.
2. The column adopting steel Q235 steel stents - A steel plate joining together, platform adopting I steel profile welding.
3, Warehouse set gasification groove at the bottom of the body, when discharging not free, assist the unloading. Set layer operation platform. Escalator fence set from zero to warehouse roof, easily up and down.
4, High and low level meter installed at the top and bottom of capsule, continuous material level meter, can effectively detect the material.
5, Slag silo is a complete functional device, its main structure is steel structure, in which pneumatic electric control equipment, slag discharge auxiliary equipment, etc.
Steel structure installation technical requirements:
1. Before installation, we should check the component according to the schedule of components, Factory prestressing assembled component assembly at the scene, according to preliminary assembling records or component group signed.
2. When installate steel structure, hole making, assembling, welding and coating process of construction shall be accordance with the relevant provisions.
3. The steel parts damage in the process of transportation, storage and the installation position should be touched up. Structure of the surface coating shall be carried out after installation.
4. The design requirements for steel structure, test in the structure should comply with the corresponding requirement of design documents.
5. The oil, ice and snow, sand and dust and other sundry on the surface of the steel should be cleared before lifting.
6. The tension flange of crane frame shall not be welded on the tension chord of suspender and fixture, etc.